Working with a local partner, TrailStone has established an NGL transloading facility in Plaza, North Dakota. The Plaza terminal is served by the Canadian Pacific Railway and aggregates NGLs produced by gas processing plants in the Bakken producing region.
The terminal engages in direct transloading from truck to railcars, utilizing a 4.5 mile private rail line controlled by the facility, as well as two ladder tracks installed as part of a capacity expansion completed in November 2016. The addition of permanent LPG storage and frack sand capabilities are being evaluated as part of on-going customer discussions.
For more information on Dakota Gold Transfer please visit http://www.dakotagoldtransfer.com.
To discuss contracting for throughput or to develop gathering connections, please contact us.